1. Preparation
Ensure that you have the following materials before starting the procedure:
- Multi Tester (Multimeter)
2. Adjusting the Communication Voltage
-
Connect the Multi Tester
- Attach the positive probe of the multi tester to the REF terminal.
- Attach the negative probe of the multi tester to the GND terminal.
-
Adjust the Voltage
- Modify the voltage setting to 910 mV.
3. Verification
- Ensure that the adjusted voltage remains stable at 910 mV.
Comments
0 comments
Please sign in to leave a comment.